Adhesive Anchoring Installation Instructions1. HOLE PREPARATION: Concrete, Brick, Hollow and Grout-Filled CMUFor horizontal, vertical and overhead applications.
2 . CARTRIDGE PREPARATION: For AT, SET, ET and ETF
3. FILLING THE HOLE: Vertical AnchoragePrepare the hole per instructions "Hole Preparation".
3. FILLING THE HOLE: Horizontal and Overhead Anchorage: For AT, SET, ET and ETFPrepare the hole per instructions "Hole Preparation".
3. FILLING THE HOLE: When Anchoring with Screens: For AT, ET, and SET (except SET1.7KT or SET1.7KTA)Prepare the hole per instructions "Hole Preparation".
3. FILLING THE HOLE: VGC Vinylester Glass Capsule (Hammer Capsule)Prepare the hole per instructions "Hole Preparation".
|
For pricing options and packages, contact us at
800.937.9021 Ext - 106, Or Strong-tie Products
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
| © Loyola Construction Products 2008 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||






















Epoxy-Tie Safety Data